Pioneer Pavilion

The Pioneer Pavilion at Mooresville High School was a comprehensive educational construction project completed over 17 months, from February 2021 to June 2022. Spanning 57,693 square feet, this project aimed to enhance the school's facilities and provide a space that the community and students could be proud of. The Pioneer Pavilion project was a significant success, meeting all timeline, budget, and programming goals set by the school corporation. Sunco's dedicated team and meticulous planning ensured the project's success, creating a facility that enhances the school and community experience.

Project Objectives

  • State-of-the-Art Fitness Center and Weight Room: Designed to serve both the school and the wider community.

  • Cafeteria Expansion: Increased capacity to reduce the number of lunch periods.

  • New Gym and Wrestling Room: Provided adequate practice space for winter sports like cheerleading, volleyball, and wrestling.

  • Improved Circulation and Building Access: Enhanced the flow and accessibility of the school.

  • Boost School Pride: Created a facility that matches the existing architecture and elevates the campus aesthetics.

Challenges and Solutions

  • Matching Existing Elevations: The addition had to align with six different elevations from the existing school buildings.

  • Work Coordination: Construction was carried out during school hours, requiring careful scheduling around testing, activities, and parking.

  • Tight Site Coordination: The limited site space necessitated meticulous planning, particularly during sitework and structure erection.

  • Foundation Work: Helical piers were installed on the existing foundation to facilitate undercutting for the new foundations.

  • Suspended Track: An elevated track was suspended from the roof structure for half of its length.

  • High-Quality Materials: Utilized 3/8" epoxy terrazzo in various areas and precast wall panels for most of the exterior.

  • Advanced Facilities: Included a state-of-the-art weight room, dedicated wrestling room, and facilities that blend seamlessly with the existing campus architecture.

Project Management

  • Construction Management of Trade Divisions 2-14: Ensured comprehensive oversight and coordination of all construction phases.

  • Onsite Supervision: A full-time superintendent and dedicated project manager were present throughout the project.

  • Regular Meetings: Conducted weekly contractor meetings for coordination and communication, and biweekly owner meetings to update the school on progress.